IAF gets first light combat

 The handover signals the start of a process of induction of the fighters being built at home under a project which has already cost the exchequer nearly Rs. 8,000 crore.

The entire project by the DRDO and Hindustan Aeronautics Limited is estimated to cost over Rs. 30,000 crore.

The aircraft that has been handed over has got Initial Operational Clearance—II, which signifies that Tejas is airworthy in different conditions, sources said. The Final Operational Clearance (FOC) is expected by the year—end.

This version of the aircraft lacks the latest electronic warfare suite, which was integrated into one of the LCAs two weeks ago, mid—air refuelling and long—range missiles capabilities, among other things that the FOC—configuration aircraft will have.

The IOC—I was granted to the aircraft, being built by state—owned Hindustan Aeronautics Limited (HAL), in January 2011.

Advertisements

About SKKBDMS Tech Media

Internet marketing - SEO, SMO, Web Design, Development, etc, view more http://www.vikral.com/

Posted on January 17, 2015, in DRDO, Hindustan Aeronautics Limited, IAF, LCA induction, LCA—SP1, Light Combat Aircraft, Manohar Parrikar, Tejas, Tejas Series Production—1. Bookmark the permalink. Leave a comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: